Production planning for the Metal industry
DeepSynergy.AI supports metal industry companies whose orders run through laser cutting, turning, grinding and further machining steps. Sequencing, set-up logic, sheet nesting, pre-material and the assignment of machines and staff all feed into one production plan.
Customer examples from the metal industry
ams OSRAMSemiconductors and optoelectronics · metalworking, CNC turning and grinding
Production planning under real-world constraints
Machines, pre-material, set-up states, shifts and staff qualifications are taken into account in one shared production plan.
View customer example+12%productivity−80%planning effort< 2 monthsto measurable results
Source: https://ams-osram.com/- Metal-processing companyMetal industry · laser cutting and nesting
On-time delivery and material efficiency at the laser
Sequencing, set-up logic and sheet nesting come together in one planning logic at the laser cutting system. New or changed orders update the plan consistently.
View customer example- Nesting as part of detailed scheduling
- Less coordination effort
- Validated results in 8–12 weeks
Illustrative image - Manufacturer of electronic componentsElectrical engineering · CNC production
Automated machine scheduling and sequencing
In the CNC production of electronic components, DeepSynergy.AI Production Planning automates machine scheduling and sequencing – geared towards the planning objective of overall equipment effectiveness (OEE).
View customer example> 5,000 hrsmore productive working time per yearup to 90%less planning effort
Illustrative image - Electrical engineering companyElectrical engineering · metalworking, turning
Assigning machines and staff in the turning shop
Production planning in the turning shop runs automatically. Machine and staff capacity is used better, set-up times fall and delivery dates stay reliable.
View customer exampleup to 90%less planning effort
Illustrative image
What makes production planning in the metal industry so demanding
In metalworking, delivery dates, set-ups and material utilisation are closely linked. A small change to the sequence can noticeably shift the daily plan.
Sheet nesting and offcuts
How parts are combined on metal sheets determines the offcut. If nesting is only considered after sequencing, material goes unused.
Set-ups by material and sequence
Set-up times depend on machine, material and order sequence. If the same material number runs again, the effort drops significantly.
Pre-material as a bottleneck
Missing pre-material shifts orders, backlogs grow and coordination effort rises. Only orders with material can actually start.
Key dates across several steps
Laser cutting, turning, grinding and downstream steps such as bending, welding or assembly must be completed in time for the delivery date.
What feeds into the production plan
DeepSynergy.AI Production Planning plans sequence, set-ups, sheet nesting, machines and staff together. The result is a plan that shows which order runs on which machine and when.
- Orders and key dates
- Production orders from SAP or another ERP, supplemented by priorities from Excel.
- Pre-material
- Which sheets, bars or blanks are available or arriving shortly.
- Set-up logic
- How long a change of material, thickness or process parameters takes – including special cases.
- Machines and capabilities
- Laser, turning and grinding machines with their availability and degree of automation.
- Staff and shifts
- Shift models and qualification matrix: who can operate which machine.
- Your planning goals
- Delivery reliability, material utilisation, machine and staff utilisation – individually weighted and balanced against each other.
Frequently asked questions about production planning in the metal industry
Can planning take nesting and sequencing into account together?
Yes. Sheet nesting is part of detailed scheduling, not a downstream step. If needed, orders can be planned in partial quantities and combined on one sheet with parts from other orders – while the shared key date is still met.
More in the article: Planning problems and trade-offs in productionHow does planning deal with missing pre-material?
Pre-material feeds directly into detailed scheduling. An order is only scheduled once enough material is available or arriving shortly. If the situation changes, a new plan for the entire planning horizon is ready in less than 30 minutes.
More in the article: Short-notice changes and re-planningAre machines and staff planned together?
Yes. A machine can only be used if qualified staff are available in the right shift. That is why machines, shift models and qualifications are considered together in one plan.
What data does planning in metalworking need?
The data already used for planning today: production orders with dates, routings, machines, shift models, qualifications and pre-material – from ERP, MES or Excel.
More in the article: The data you need for production planningDoes this work with our SAP system?
Yes. DeepSynergy.AI Production Planning complements SAP or another ERP with a specialised planning layer and does not replace it. In the laser cutting customer example, orders came from SAP and were supplemented by Excel data – without changing systems.
More in the article: ERP and MES integration: a complement, not a replacementCustomer examples from other industries
Planning tasks are often similar across industries.
What potential lies in your production planning?
In the free potential check, we talk about your production planning and assess together whether and where DeepSynergy.AI Production Planning can help.