
On-time delivery and material efficiency in laser cutting
- Industry
- Metal processing
- Process
- Laser cutting and nesting
- Planning
- Sequencing
Anonymised at the customer’s request
Scope
5
planning building blocks in one consistent logic
Project duration
8–12
weeks to validated results
Operating mode
On demand
plan output, even after short-notice changes
Data basis
SAP + Excel
as the data basis – no system change
Starting point
Planning as the bottleneck
The company manufactures metal assemblies. In pre-production at the laser cutting system, every day decides whether delivery dates are met and how efficiently material is used.
Planning was largely manual: orders were prepared in Excel and often worked through one after another in production, with much of the information passed on via paper notes and short-notice coordination. Three objectives directly affect one another:
Solution
Five building blocks, one planning logic
In a joint workshop, planning logic, dependencies and priorities were captured, documented and agreed with the customer. Production orders come from SAP and are supplemented with structured Excel data. In the DeepSynergy.AI Planning Engine, the logic is mapped in a weighted objective system:
Deep dive
Per-piece logic instead of rigid order logic
An order may contain several identical parts needed for an assembly by a key date. If it is only considered as a whole, the parts usually end up together on one or a few sheets – leaving free space unused.
DeepSynergy.AI Production Planning breaks such orders down to piece level. Individual parts are spread across different sheets and nested with parts from other orders – while the shared key date is still met.
Better sheet utilisation
Leftover areas are filled with suitable parts from other orders.
Less offcut
Smart nesting reduces unused material.
On-time delivery holds
All quantities of an order are finished in time for the key date.

Results
From plan to impact
Planning becomes traceable and repeatable. Decisions follow consistent logic instead of case-by-case judgement, and changes can be integrated into the process cleanly.
Clarity on priorities
It becomes visible how priorities affect deadlines, material use and the course of the plan.
Less coordination
Planning and production work from a shared basis.
Stable despite disruption
Short-notice changes cause less upheaval.
Planning that scales
Know-how is captured systematically and depends less on individuals.
Material and deadlines combined
Decisions take several objectives into account at once.
Better interplay
Supply to downstream processes becomes more reliable.
Project timeline
Validated results in 8–12 weeks
- Step 1:
Potential workshop
Bottlenecks, challenges and trade-offs in current planning – and where DeepSynergy.AI Production Planning can make a difference.
- Step 2:
Parallel planning
Planners' knowledge made usable in workshops; a first production plan alongside existing planning.
- Step 3:
KPI validation
Key KPIs of previous planning compared with DeepSynergy.AI Production Planning planning as the basis for next steps.
Do you need to balance delivery dates, set-up effort and material utilisation at the same time?
In the free potential check (45 minutes, on Google Meet), we talk about your planning task and assess together whether DeepSynergy.AI Production Planning is a good fit.