On-time delivery and material efficiency in laser cutting

Industry
Metal processing
Process
Laser cutting and nesting
Planning
Sequencing

Anonymised at the customer’s request

Scope

5

planning building blocks in one consistent logic

Project duration

8⁠–⁠12

weeks to validated results

Operating mode

On demand

plan output, even after short-notice changes

Data basis

SAP + Excel

as the data basis – no system change

Starting point

Planning as the bottleneck

The company manufactures metal assemblies. In pre-production at the laser cutting system, every day decides whether delivery dates are met and how efficiently material is used.

Planning was largely manual: orders were prepared in Excel and often worked through one after another in production, with much of the information passed on via paper notes and short-notice coordination. Three objectives directly affect one another:

Key dates — Fixed delivery or completion dates set the priority – which gets difficult when related orders are not linked.
Sheet nesting — How parts are combined on the metal sheets determines the offcut.
Set-ups — Changeovers between materials or process parameters create effort and affect the sequence.

Solution

Five building blocks, one planning logic

In a joint workshop, planning logic, dependencies and priorities were captured, documented and agreed with the customer. Production orders come from SAP and are supplemented with structured Excel data. In the DeepSynergy.AI Planning Engine, the logic is mapped in a weighted objective system:

Sequencing — Key dates and priorities are translated into a workable sequence.
Set-up logic — Changeover effort is a fixed part of planning, including special cases.
Sheet nesting — Nesting is part of detailed scheduling, not just a downstream step.
Per-piece logic — Orders are planned in partial quantities where useful and combined with other orders.
Re-optimisation — New or changed orders lead to a consistent update of the plan.

Deep dive

Per-piece logic instead of rigid order logic

An order may contain several identical parts needed for an assembly by a key date. If it is only considered as a whole, the parts usually end up together on one or a few sheets – leaving free space unused.

DeepSynergy.AI Production Planning breaks such orders down to piece level. Individual parts are spread across different sheets and nested with parts from other orders – while the shared key date is still met.

Better sheet utilisation

Leftover areas are filled with suitable parts from other orders.

Less offcut

Smart nesting reduces unused material.

On-time delivery holds

All quantities of an order are finished in time for the key date.

Rows of figures representing planning data

Results

From plan to impact

Planning becomes traceable and repeatable. Decisions follow consistent logic instead of case-by-case judgement, and changes can be integrated into the process cleanly.

Clarity on priorities

It becomes visible how priorities affect deadlines, material use and the course of the plan.

Less coordination

Planning and production work from a shared basis.

Stable despite disruption

Short-notice changes cause less upheaval.

Planning that scales

Know-how is captured systematically and depends less on individuals.

Material and deadlines combined

Decisions take several objectives into account at once.

Better interplay

Supply to downstream processes becomes more reliable.

Project timeline

Validated results in 8⁠–⁠12 weeks

  1. Step 1:

    Potential workshop

    Bottlenecks, challenges and trade-offs in current planning – and where DeepSynergy.AI Production Planning can make a difference.

  2. Step 2:

    Parallel planning

    Planners' knowledge made usable in workshops; a first production plan alongside existing planning.

  3. Step 3:

    KPI validation

    Key KPIs of previous planning compared with DeepSynergy.AI Production Planning planning as the basis for next steps.

Do you need to balance delivery dates, set-up effort and material utilisation at the same time?

In the free potential check (45 minutes, on Google Meet), we talk about your planning task and assess together whether DeepSynergy.AI Production Planning is a good fit.

Free potential check(opens booking calendar in a new tab)