Experience-based knowledge as the basis for planning impregnation

Industry
Print and paper
Process
Impregnation and lacquering
Planning
Sequencing

Anonymised at the customer’s request

Scope

1 plant

impregnation and lacquering as the pilot area

Project status

Pilot project

completed, with a closing meeting on results and next steps

Data basis

Excel

exchanged by email as the data basis in the pilot project

Plan output

Gantt plan

agreed output – set-up and production per machine, plus Excel

Starting point

Planning knowledge that is not in SAP

The company finishes specialty papers. At the plant in question, the papers are impregnated and, depending on the order, lacquered. Depending on the order, maturing, turning, audit and packing follow before the rolls or pallets go into storage.

Planning was manual. A planning spreadsheet held information missing from SAP, and much of the knowledge existed mainly as the experience of the people responsible. Two goals were at the centre:

Delivery dates — Minimise late deliveries – taking customer-specific priorities into account.
Output — Increase productive output and machine utilisation with as few set-up changes as possible.

Planning task

Every transition counts

How long an order runs depends on its length and the speed of the machine. The effort in between depends on the previous order – and on what changes compared with it:

Recipe and resin — Recipe transitions and resin changes determine set-up effort and cleaning, with machine-specific durations.
Width, speed, brightness — Changes in paper width, speed, paper type and brightness alter the transition effort.
Major cleanings — Fixed duration, a maximum permitted interval and no interruption.
Downstream processes — Not every order passes through all downstream steps; quality assurance is available only at certain times.
Material and orders — Assigned pre-material rolls must be available; only approved orders may be split, above a minimum size.

Solution

From workshop to production plan

In a joint workshop with production planning, supply chain, group-wide impregnation coordination, digitalisation and IT, the team captured machine capabilities, production and transition times, cleanings, material availability, downstream processes, delivery dates and priorities. These rules form the basis for planning with DeepSynergy.AI Production Planning.

The data arrived as Excel. From it, DeepSynergy.AI Production Planning creates a plan that makes these decisions together:

Machine assignment — Each order runs on a suitable impregnation machine.
Sequence and dates — Orders are scheduled so that delivery dates and priorities are taken into account.
Set-up and cleaning — Transitions and major cleanings are a fixed part of the plan.
Downstream processes — Maturing, turning, audit and packing are planned per order.

Deep dive

When transitions overlap

Transition effects are not simply added up. Some act at the same time, others one after another. If speed and width change together, for example, the longer of the two effects applies. Other combinations are treated differently depending on the material used.

Before, this knowledge existed mainly in the planners' heads. In the workshop it was documented as rules – including the combinations that need no set-up at all.

Parallel effects

If several changes act at once, the longest one counts.

Additive effects

Other changes add up and lengthen the transition.

Zero set-up transitions

Certain combinations continue directly without set-up effort.

Reading data correctly

In contract manufacturing, a pre-material quantity of zero does not automatically mean missing material.

Results

What the pilot project showed

In the pilot project, a production plan was created for impregnation at the pilot plant. In the subsequent meeting with the customer, basic feasibility at the complex site was rated positively.

Knowledge structured

Information that previously existed only in people's heads is now documented.

Focus on set-up

The joint discussion gave the topic of set-up greater weight.

Processes questioned

Together, the team examined why processes had been run a certain way.

More stability

In the closing meeting, more stability and fewer human errors were named as benefits.

Project flow

From workshop to first plan

  1. Step 1:

    Workshop

    Process, goals, rules and data requirements of impregnation captured together.

  2. Step 2:

    Data clarification

    Planning data aligned with the customer and special cases clearly defined.

  3. Step 3:

    Production plan

    Plan created with DeepSynergy.AI Production Planning – set-up and production per machine.

  4. Step 4:

    Closing meeting

    Results discussed with management and next steps agreed.

Further impregnation sites and lacquering were named as possible extensions.

Do recipe, width and brightness changes determine the sequence in your production?