ams OSRAM: Productivity and on-time delivery in metalworking
Customer project · Metalworking
+12%
increase in productivity
1,000 hrs
more productive working time per year
−80%
planning effort
+10%
improvement in on-time delivery
Starting point
Planning under real-world constraints
Missing pre-material repeatedly becomes an operational bottleneck – leading to missed delivery dates, backlogs and a high coordination effort. At the same time, production planning has to take machine availability, set-up states, shift plans and staff qualifications into account together.
The central trade-off: meet delivery dates reliably and reduce backlogs – while keeping machine and staff utilisation optimal.

Solution
How constraints become a plan
DeepSynergy.AI Production Planning brings delivery dates, pre-material, set-up states, machine availability, shift plans and qualifications together in an individually weighted objective system.

Implementation
Real-world rules the plan reflects
Planning builds on existing data: orders from SAP, delivery dates, pre-material, routings, machine availability, shift plans and qualifications. In the workshop, the planners' experience was translated into clear decision rules – such as these:
Results
What improves day to day
Production planning becomes more systematic, traceable and repeatable – decisions are based on consistent logic instead of short-notice coordination.
Productivity without extra headcount
Backlogs are cleared more efficiently and machines and staff are matched more precisely.
More transparency and acceptance
The plan shows which orders are scheduled on which machines – and it is accepted in production.
Stable despite change
New call-offs, data corrections or missing pre-material no longer cause immediate disruption. A new plan is ready within minutes.
Less firefighting
Fewer short-notice interventions free up time for forward-looking planning.

Project timeline
Three steps to validated planning
- Step 1:
Potential workshop
Current planning situation, bottlenecks and trade-offs in the turning shop; a clearly defined scope.
- Step 2:
Parallel planning
Planning logic modelled in workshops and from existing data; a first plan run in parallel and refined through feedback loops.
- Step 3:
KPI validation
Key KPIs of previous planning compared with DeepSynergy.AI Production Planning planning, complemented by feedback from production.
Measurable results in under two months, validated within twelve weeks.