ERP and MES integration: a complement, not a replacement

DeepSynergy.AI Production Planning complements ERP and MES. How integration happens step by step – from manual data exchange to a full API connection.

Written by Matthäus Niedermeier · · updated · 2 min read

The short answer: DeepSynergy.AI Production Planning does not replace an ERP or MES system; it complements them with a specialised planning layer. In the early project phases, data is deliberately exchanged manually or semi-automatically. Integration into ERP and MES only follows with the implementation.

A complement, not a replacement

ERP and MES systems are the backbone of production: they manage orders, master data, inventory and feedback from production. But they are rarely built for complex detailed scheduling with many simultaneous dependencies. This is where DeepSynergy.AI Production Planning comes in:

  1. The planning data comes from ERP and MES.
  2. The Planning Engine creates an optimised production plan from it.
  3. The plan goes back to the planner and into the existing systems.

Your system landscape stays as it is; no system change is needed.

Getting started: deliberately without full interface development

In the early project phases, data is exchanged via exports, such as Excel or CSV files. This has three advantages:

  • No unnecessary cost: interfaces are only built once it is clear that the solution works.
  • No full interface development at the start: existing data exports can be used for the first validation. We agree data provision, access and responsibilities with the teams involved.
  • Validation alongside ongoing operations: the plans created are first checked in parallel with the existing planning and are not yet used to control production.

Which data is needed is described in The data you need for production planning.

Implementation: integration into ERP and MES

After parallel planning and your decision, integration follows. Data retrieval and plan return are then automated, for example through an API connection to the ERP or MES system. Planning can then run on demand or cyclically. How this fits into the overall process is shown in Productive planning in 8⁠–⁠12 weeks.

SAP environments

At ams OSRAM and in the laser cutting example, production orders come from SAP.

How the plan is delivered

How the plan reaches the planner depends on the process:

  • as an image file for production,
  • as an Excel, CSV or JSON file,
  • in the dashboard with KPIs and scenarios,
  • via an API connection to ERP or MES.

More on the result in The result: a production plan you can rely on.

How much potential is there in your planning?

In the free potential check (45 minutes), we talk about your current planning and assess together whether and where DeepSynergy.AI Production Planning can help.

Free potential check(opens booking calendar in a new tab)