Productive planning in 8–12 weeks
Productive planning in 8–12 weeks: the four phases from potential check to plan-as-a-service – no full interface development needed to get started.
The short answer: It takes 8–12 weeks from the potential check to productive, validated planning. The path has four phases: a free potential check, a paid potential workshop, the proof of value with configuration and KPI validation, and ongoing operation as plan-as-a-service. In customer projects, measurable results were available in under two months.
Phase 1: potential check (free of charge)
In a free first call, we talk about your starting point and your most important planning objectives and assess together whether DeepSynergy.AI Production Planning fits your planning task. You then decide whether to continue, and with what scope. Details in Potential check and workshop: getting started.
Phase 2: potential workshop (chargeable)
- Workshop: planning knowledge is captured and translated into rules.
- Planning documentation: the rules are documented and agreed with you.
Phase 3: proof of value – configuration and KPI validation
- Engine configuration: the engine is set up for your processes, objectives and data.
- Agreeing the reference planning: together we agree the KPIs and which existing planning serves as the comparison. A first plan based on real data is compared with this reference planning.
- Parallel planning: the plans created are compared with the reference planning under comparable conditions.
Planning with DeepSynergy.AI Production Planning now runs alongside your existing planning. Further plans are created, refined through feedback loops and compared with the reference planning under comparable conditions. During parallel planning, production continues to run on the existing plan; the plans created are first assessed separately. The phase ends with a clear basis for decision-making and an implementation plan.
Phase 4: plan-as-a-service
With go-live, planning moves into operation – on demand when things change, or cyclically, such as every shift or every day. During implementation, the solution is integrated into your system landscape (see ERP and MES integration).
Why getting started needs no full interface development
In the early phases, data is deliberately exchanged manually or semi-automatically, for example as Excel or CSV files. This saves the cost of interfaces that are not yet needed. The effort for providing data and access is clarified together at the outset. Integration only pays off once it is clear that the solution works.
KPIs, basis for comparison and measuring success
At the outset, we agree the relevant KPIs and a basis for comparison drawn from your existing planning. We then compare the plans created with DeepSynergy.AI Production Planning under comparable conditions. Parallel planning shows the calculated potential for improvement. The improvements actually achieved in operation are measured separately after implementation. How the benefit is proven is described in How the economic benefit is proven.
From practice
- At ams OSRAM, measurable results were available in under two months and validated within twelve weeks.
- At MEGGLE, measurable results also took less than two months.
- In the laser cutting example, the path to validated results takes eight to twelve weeks.
How much potential is there in your planning?
In the free potential check (45 minutes), we talk about your current planning and assess together whether and where DeepSynergy.AI Production Planning can help.