How the economic benefit is proven

KPIs, reference planning, plan comparison: calculated improvement potential vs. improvements measured in operation – with results from customer projects.

Written by Dominik Eibl · · updated · 2 min read

The short answer: At the outset, we agree the relevant KPIs and a basis for comparison drawn from your existing planning. We then compare the plans created with DeepSynergy.AI Production Planning under comparable conditions. Parallel planning shows the calculated potential for improvement; the improvements actually achieved in operation are measured separately after implementation. On average across all customer results, there is a 10⁠–⁠30% increase in efficiency, 70⁠–⁠90% less planning effort and a return on investment in under 12 months.

Agree the planning KPIs at the outset

What “better” means depends on the plant. That is why the KPIs the plan will be measured against are agreed at the start – for example:

  • on-time delivery and backlogs,
  • utilisation of machines and staff,
  • set-up and lead times,
  • scrap and material use,
  • planning effort.

Reference planning as the basis for comparison

The basis for comparison is your existing planning for a defined comparison case – the reference planning. If it is reconstructed for the comparison, we label it as a reconstructed reference. The comparison is made under comparable conditions: with the same orders, resources, rules and KPI definitions.

Parallel planning as a plan comparison

During the four weeks of parallel planning, plans are created with DeepSynergy.AI Production Planning alongside the existing planning. Production continues to run on the existing plan, and the alternatives created are first assessed separately. The plan comparison shows the calculated potential for improvement, complemented by feedback from production. The dashboard makes this comparison transparent (see The result: a production plan you can rely on).

Improvements measured in operation

The improvements actually achieved in operation are measured separately after implementation – over a defined period and against a stated basis for comparison.

Results from customer projects

Customer project Result
ams OSRAM, metalworking +12% productivity, −80% planning effort, measurable results in under 2 months
MEGGLE, spray drying and powder production +4% productivity, 80% less planning effort, measurable results in under 2 months
NOWOFOL, specialty films Less scrap compared with conventional planning

Across all customer projects: 10⁠–⁠30% higher efficiency, 70⁠–⁠90% less planning effort, ROI in under 12 months. These figures are averages of the results from these customer projects.

Where the benefit comes from

  • Efficiency: optimised sequencing, loading and resource use increase output – without additional machines or staff.
  • Planning effort: fully automated detailed scheduling relieves the planning team. Less firefighting, more control.
  • Change: on-demand re-planning protects productivity and resources even when the situation changes.
  • Quality and material: better sequencing and loading can reduce scrap and offcuts, as at NOWOFOL and with nesting in laser cutting.

Whether and where DeepSynergy.AI Production Planning can help with your planning is what we clarify in the free potential check.

How much potential is there in your planning?

In the free potential check (45 minutes), we talk about your current planning and assess together whether and where DeepSynergy.AI Production Planning can help.

Free potential check(opens booking calendar in a new tab)