How your planners’ knowledge gets into the plan
Experience is the most valuable planning input. How it is structured, documented and turned into planning logic in a workshop – without replacing planners.
The short answer: Your planners’ knowledge is captured together in the potential workshop, translated into clear planning rules and recorded as planning documentation. This documented planning logic is the first input to the Planning Engine. Planners are not replaced – they keep making decisions, but on a transparent basis.
The most valuable knowledge is in no system
Every production site has rules that are written down nowhere: we only use this machine in an emergency; we run this material in one go; this customer comes first when things get tight. This kind of experience is what makes a good planner – and it is often tied to individuals. When someone is absent or leaves, part of the planning quality goes with them.
Typical kinds of implicit knowledge include:
- Rules: fixed conditions, such as which machine can process which order.
- Exceptions: special cases that apply only under certain circumstances.
- Priorities: what comes first when objectives conflict.
From workshop to documented planning foundation
The path to usable planning logic starts with a joint workshop on how production actually runs. The focus is on real processes, resources, constraints and dependencies – not the target process from the manual.
- Capture: planners, supervisors and production describe how planning and decisions work today.
- Structure: the rules are reviewed together and translated into clear decision logic.
- Document: the result is planning documentation that is agreed with you.
- Configure: the engine is configured on this basis.
How the workshop works in practice is described in Potential check and workshop: getting started.
Making trade-offs visible
An important side effect: once rules are written down, contradictions become visible. Two planners weight the same situation differently, or two rules rule each other out. The workshop therefore also clarifies what a good plan has to achieve day to day. At a metal-processing company, this produced a shared understanding of what is planned, which rules decisions follow and which objectives take priority.
Example: pre-material as a start filter at ams OSRAM
At ams OSRAM in Schwabmünchen, pre-material repeatedly became a bottleneck. The workshop captured the rule: an order can only start once enough pre-material is available or arriving shortly – a start is possible from 95% of the required pre-material. Some material groups are always available, others are actively accounted for. It was also agreed that the last relevant process step must be completed at least 48 hours before the delivery date, or 72 hours for Monday deliveries.
For an experienced planner, rules like these go without saying. For a planning system, they have to be made explicit.
Planners stay in charge
The aim is not to replace planners but to relieve them. Recurring decisions are made consistently, and know-how is captured systematically and depends less on individuals. Planners keep control: they review plans, compare scenarios and adjust priorities. Instead of short-notice coordination, there is more time for forward-looking planning.
How much potential is there in your planning?
In the free potential check (45 minutes), we talk about your current planning and assess together whether and where DeepSynergy.AI Production Planning can help.